Kelson Ridge 230kV (W4-044)

Kelson Ridge 230kV is a 725.0 MW gas interconnection project in Charles, Maryland with a current status of withdrawn.

725.0 MWCapacity
WithdrawnStatus
—Market
GasTechnology

Project facts

Canonical nameKelson Ridge 230kV
Queue IDW4-044
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyGas
Capacity725.0 MW
StateMaryland
CountyCharles
Point of interconnection—
Requested (queue) date2011-01-05
Proposed in-service date2015-06-01
Operational date—
Withdrawn date2013-07-31
Developer—
Utility / transmission ownerPEPCO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.