Kenmore Energy Storage Project (1538)

Kenmore Energy Storage Project is a 20.0 MW battery interconnection project in Erie, New York with a current status of withdrawn. It is proposed to connect at National Grid 115kV Line 46, 2.98 miles from Praxair (Buffalo Sewer) 115kV station and 3.21 miles from Huntley 115kV station..

20.0 MWCapacity
WithdrawnStatus
AMarket
BatteryTechnology

Project facts

Canonical nameKenmore Energy Storage Project
Queue ID1538
Statuswithdrawn
Source status0
MarketA
TechnologyBattery
Capacity20.0 MW
StateNew York
CountyErie
Point of interconnectionNational Grid 115kV Line 46, 2.98 miles from Praxair (Buffalo Sewer) 115kV station and 3.21 miles from Huntley 115kV station.
Requested (queue) date2023-03-20
Proposed in-service date2023-06-30
Operational date
Withdrawn date
DeveloperSaturn Energy Storage LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata