KENOWA - NELSON ROAD 345.0kV (J1918)

KENOWA - NELSON ROAD 345.0kV is a 132.0 MW solar interconnection project in Montcalm, Michigan with a current status of operational. It is proposed to connect at KENOWA - NELSON ROAD 345.0kV.

132.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameKENOWA - NELSON ROAD 345.0kV
Queue IDJ1918
Statusoperational
Source statusLEGACY: Done
Market
TechnologySolar
Capacity132.0 MW
StateMichigan
CountyMontcalm
Point of interconnectionKENOWA - NELSON ROAD 345.0kV
Requested (queue) date2021-08-24
Proposed in-service date2023-11-01
Operational date2023-11-01
Withdrawn date
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata