Kent County Substation - NG Western RI DG Area Study (965)

Kent County Substation - NG Western RI DG Area Study is a 10.4 MW solar interconnection project in Kent, Rhode Island with a current status of withdrawn. It is proposed to connect at NG Lafayette No. 30 (supplied by Kent County Substation).

10.4 MWCapacity
WithdrawnStatus
RIMarket
SolarTechnology

Project facts

Canonical nameKent County Substation - NG Western RI DG Area Study
Queue ID965
Statuswithdrawn
Source statusW
MarketRI
TechnologySolar
Capacity10.4 MW
StateRhode Island
CountyKent
Point of interconnectionNG Lafayette No. 30 (supplied by Kent County Substation)
Requested (queue) date2020-03-18
Proposed in-service date2021-08-15
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata