Kent County Substation - Western RI DER Study #3 (1589)

Kent County Substation - Western RI DER Study #3 is a 21.7 MW solar interconnection project in Kent, Rhode Island with a current status of withdrawn. It is proposed to connect at RIE feeder 3309 and 3311, Kent County Substation.

21.7 MWCapacity
WithdrawnStatus
RIMarket
SolarTechnology

Project facts

Canonical nameKent County Substation - Western RI DER Study #3
Queue ID1589
Statuswithdrawn
Source statusW
MarketRI
TechnologySolar
Capacity21.7 MW
StateRhode Island
CountyKent
Point of interconnectionRIE feeder 3309 and 3311, Kent County Substation
Requested (queue) date2024-08-19
Proposed in-service date2026-12-31
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata