Kent County Substation - Western RI DER Study #3 (1589)
Kent County Substation - Western RI DER Study #3 is a 21.7 MW solar interconnection project in Kent, Rhode Island with a current status of withdrawn. It is proposed to connect at RIE feeder 3309 and 3311, Kent County Substation.
21.7 MWCapacity
WithdrawnStatus
RIMarket
SolarTechnology
Project facts
| Canonical name | Kent County Substation - Western RI DER Study #3 |
|---|---|
| Queue ID | 1589 |
| Status | withdrawn |
| Source status | W |
| Market | RI |
| Technology | Solar |
| Capacity | 21.7 MW |
| State | Rhode Island |
| County | Kent |
| Point of interconnection | RIE feeder 3309 and 3311, Kent County Substation |
| Requested (queue) date | 2024-08-19 |
| Proposed in-service date | 2026-12-31 |
| Operational date | — |
| Withdrawn date | 2025-06-13 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.