Keystone XL (Pumping station - 14) - 115kV (J1766)

Keystone XL (Pumping station - 14) - 115kV is a 20.0 MW solar interconnection project in Fallon, Montana with a current status of withdrawn. It is proposed to connect at Keystone XL (Pumping station - 14) - 115kV.

20.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameKeystone XL (Pumping station - 14) - 115kV
Queue IDJ1766
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity20.0 MW
StateMontana
CountyFallon
Point of interconnectionKeystone XL (Pumping station - 14) - 115kV
Requested (queue) date2020-06-24
Proposed in-service date2023-10-15
Operational date2023-10-15
Withdrawn date2021-11-17
Developer
Utility / transmission ownerMONTANA-DAKOTA UTILITIES CO.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata