Killdeer 345/161 sub (Emery station 161 outlet) (J2810)

Killdeer 345/161 sub (Emery station 161 outlet) is a 100.0 MW battery interconnection project in Cerro Gordo, Iowa with a current status of withdrawn. It is proposed to connect at Killdeer 345/161 sub (Emery station 161 outlet).

100.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameKilldeer 345/161 sub (Emery station 161 outlet)
Queue IDJ2810
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity100.0 MW
StateIowa
CountyCerro Gordo
Point of interconnectionKilldeer 345/161 sub (Emery station 161 outlet)
Requested (queue) date2022-09-14
Proposed in-service date2026-09-01
Operational date2026-09-01
Withdrawn date2023-03-24
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata