Killdeer 345 kV Substation (J3206)

Killdeer 345 kV Substation is a 194.0 MW wind interconnection project in Cerro Gordo, Iowa with a current status of withdrawn. It is proposed to connect at Killdeer 345 kV Substation.

194.0 MWCapacity
WithdrawnStatus
—Market
WindTechnology

Project facts

Canonical nameKilldeer 345 kV Substation
Queue IDJ3206
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyWind
Capacity194.0 MW
StateIowa
CountyCerro Gordo
Point of interconnectionKilldeer 345 kV Substation
Requested (queue) date2022-09-14
Proposed in-service date2027-06-01
Operational date2027-06-01
Withdrawn date2025-10-27
Developer—
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-31phasePhase 2Phase 3low
2026-10-14phasePhase 1Phase 2low
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata