Killdeer- Blackhawk 345kV Line (J873)

Killdeer- Blackhawk 345kV Line is a 200.0 MW wind interconnection project in Hardin County, Iowa with a current status of withdrawn. It is proposed to connect at Killdeer- Blackhawk 345kV Line.

200.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameKilldeer- Blackhawk 345kV Line
Queue IDJ873
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity200.0 MW
StateIowa
CountyHardin County
Point of interconnectionKilldeer- Blackhawk 345kV Line
Requested (queue) date2017-06-16
Proposed in-service date2021-07-01
Operational date2021-07-01
Withdrawn date2021-01-29
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata