KILLDEER3 (631199) 345 KV TO BLACKHAWK (636199) 345 kv line Tap (J1822)

KILLDEER3 (631199) 345 KV TO BLACKHAWK (636199) 345 kv line Tap is a 200.0 MW wind interconnection project in Franklin, Iowa with a current status of withdrawn. It is proposed to connect at KILLDEER3 (631199) 345 KV TO BLACKHAWK (636199) 345 kv line Tap.

200.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameKILLDEER3 (631199) 345 KV TO BLACKHAWK (636199) 345 kv line Tap
Queue IDJ1822
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity200.0 MW
StateIowa
CountyFranklin
Point of interconnectionKILLDEER3 (631199) 345 KV TO BLACKHAWK (636199) 345 kv line Tap
Requested (queue) date2020-06-25
Proposed in-service date2023-06-01
Operational date2023-06-01
Withdrawn date2021-01-04
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.