Kingston 12 kV II (AG1-149)

Kingston 12 kV II is a 3.0 MW battery interconnection project in Somerset, Maryland with a current status of withdrawn.

3.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameKingston 12 kV II
Queue IDAG1-149
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity3.0 MW
StateMaryland
CountySomerset
Point of interconnection—
Requested (queue) date2020-09-09
Proposed in-service date2021-12-01
Operational date—
Withdrawn date2021-06-07
Developer—
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata