Kootenai Generation (G32)

Kootenai Generation is a 1,300.0 MW gas interconnection project in Kootenai, Washington with a current status of withdrawn. It is proposed to connect at BPA's Taft-Bell 500 kV line.

1,300.0 MWCapacity
WithdrawnStatus
WAMarket
GasTechnology

Project facts

Canonical nameKootenai Generation
Queue IDG32
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyGas
Capacity1,300.0 MW
StateWashington
CountyKootenai
Point of interconnectionBPA's Taft-Bell 500 kV line
Requested (queue) date2001-03-05
Proposed in-service date2005-06-01
Operational date
Withdrawn date
DeveloperKootenai Electric Cooperative, Inc.
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata