Kossuth-O'Brien 345kV (J731)
Kossuth-O'Brien 345kV is a 200.0 MW wind interconnection project in Palo Alto County, Iowa with a current status of withdrawn. It is proposed to connect at Kossuth-O'Brien 345kV.
200.0 MWCapacity
WithdrawnStatus
—Market
WindTechnology
Project facts
| Canonical name | Kossuth-O'Brien 345kV |
|---|---|
| Queue ID | J731 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Wind |
| Capacity | 200.0 MW |
| State | Iowa |
| County | Palo Alto County |
| Point of interconnection | Kossuth-O'Brien 345kV |
| Requested (queue) date | 2016-11-08 |
| Proposed in-service date | 2020-09-23 |
| Operational date | 2020-09-23 |
| Withdrawn date | 2019-04-09 |
| Developer | — |
| Utility / transmission owner | MIDAMERICAN ENERGY CO. |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata