KPFF (L0676)
KPFF is a 9.8 MW other interconnection project with a current status of operational. It is proposed to connect at Cowlitz Substation.
9.8 MWCapacity
OperationalStatus
—Market
OtherTechnology
Project facts
| Canonical name | KPFF |
|---|---|
| Queue ID | L0676 |
| Status | operational |
| Source status | BPA COMPLETED |
| Market | — |
| Technology | Other |
| Capacity | 9.8 MW |
| State | — |
| County | Cowlitz |
| Point of interconnection | Cowlitz Substation |
| Requested (queue) date | 2025-10-30 |
| Proposed in-service date | — |
| Operational date | 2028-10-30 |
| Withdrawn date | — |
| Developer | Public Utility District No. 1 of Cowlitz County |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata