L0518 Pacific Substation Transformer (L0518)

L0518 Pacific Substation Transformer is a 21.0 MW other interconnection project in Cassia, Idaho with a current status of withdrawn. It is proposed to connect at Unity-West Burley No 1 138 kV, Pacific Tap POD 4313.

21.0 MWCapacity
WithdrawnStatus
IDMarket
OtherTechnology

Project facts

Canonical nameL0518 Pacific Substation Transformer
Queue IDL0518
Statuswithdrawn
Source statusWITHDRAWN
MarketID
TechnologyOther
Capacity21.0 MW
StateIdaho
CountyCassia
Point of interconnectionUnity-West Burley No 1 138 kV, Pacific Tap POD 4313
Requested (queue) date2022-03-11
Proposed in-service date2025-03-07
Operational date
Withdrawn date
DeveloperUnited Electric Co-op, Inc.
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata