L0518 Pacific Substation Transformer (L0518)
L0518 Pacific Substation Transformer is a 21.0 MW other interconnection project in Cassia, Idaho with a current status of withdrawn. It is proposed to connect at Unity-West Burley No 1 138 kV, Pacific Tap POD 4313.
21.0 MWCapacity
WithdrawnStatus
IDMarket
OtherTechnology
Project facts
| Canonical name | L0518 Pacific Substation Transformer |
|---|---|
| Queue ID | L0518 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | ID |
| Technology | Other |
| Capacity | 21.0 MW |
| State | Idaho |
| County | Cassia |
| Point of interconnection | Unity-West Burley No 1 138 kV, Pacific Tap POD 4313 |
| Requested (queue) date | 2022-03-11 |
| Proposed in-service date | 2025-03-07 |
| Operational date | — |
| Withdrawn date | — |
| Developer | United Electric Co-op, Inc. |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata