LA_ORD_115 (J3221)

LA_ORD_115 is a 49.0 MW solar interconnection project in Webster, Louisiana with a current status of withdrawn. It is proposed to connect at LA_ORD_115.

49.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameLA_ORD_115
Queue IDJ3221
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity49.0 MW
StateLouisiana
CountyWebster
Point of interconnectionLA_ORD_115
Requested (queue) date2022-09-15
Proposed in-service date2024-11-30
Operational date2024-11-30
Withdrawn date2025-07-30
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata