LA130S Project (LG-19-3-2)

LA130S Project is a 130.0 MW solar+battery interconnection project in Luna, New Mexico with a current status of active. It is proposed to connect at Mesquite 345 kV Substation.

130.0 MWCapacity
ActiveStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameLA130S Project
Queue IDLG-19-3-2
Statusactive
Source statusactive
MarketWest
TechnologySolar+Battery
Capacity130.0 MW
StateNew Mexico
CountyLuna
Point of interconnectionMesquite 345 kV Substation
Requested (queue) date2019-03-25
Proposed in-service date2026-02-27
Operational date
Withdrawn date
Developer
Utility / transmission ownerEl Paso Electric Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.