LA300W (LG 22-3-6)
LA300W is a 155.0 MW wind interconnection project in Luna County, New Mexico with a current status of withdrawn. It is proposed to connect at Mesquite 345 kV Substation.
155.0 MWCapacity
WithdrawnStatus
NMMarket
WindTechnology
Project facts
| Canonical name | LA300W |
|---|---|
| Queue ID | LG 22-3-6 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | NM |
| Technology | Wind |
| Capacity | 155.0 MW |
| State | New Mexico |
| County | Luna County |
| Point of interconnection | Mesquite 345 kV Substation |
| Requested (queue) date | 2022-03-31 |
| Proposed in-service date | 2028-12-15 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | El Paso Electric Company |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: epe-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata