Labadie is a 573.7 MW other interconnection project in Franklin, Missouri with a current status of operational.

573.7 MWCapacity
OperationalStatus
MISOMarket
OtherTechnology

Project facts

Canonical nameLabadie
Queue ID2103_2
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyOther
Capacity573.7 MW
StateMissouri
CountyFranklin
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1971-06-01
Withdrawn date
Developer
Utility / transmission ownerUnion Electric Co - (MO)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata