LaCygne - Neosho 345 kV Line Break (GEN-2018-101)

LaCygne - Neosho 345 kV Line Break is a 175.0 MW solar interconnection project in Bates, Missouri with a current status of withdrawn. It is proposed to connect at LaCygne - Neosho 345 kV Line Break.

175.0 MWCapacity
WithdrawnStatus
MOMarket
SolarTechnology

Project facts

Canonical nameLaCygne - Neosho 345 kV Line Break
Queue IDGEN-2018-101
Statuswithdrawn
Source statusWITHDRAWN
MarketMO
TechnologySolar
Capacity175.0 MW
StateMissouri
CountyBates
Point of interconnectionLaCygne - Neosho 345 kV Line Break
Requested (queue) date2018-11-21
Proposed in-service date2025-12-31
Operational date
Withdrawn date2022-12-01
Developer
Utility / transmission ownerKCPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata