Lakeover CCCT (E0047)
Lakeover CCCT is a 820.0 MW gas interconnection project in Hinds, Mississippi with a current status of active. It is proposed to connect at Green Acres 230kV (new).
820.0 MWCapacity
ActiveStatus
MISOMarket
GasTechnology
Project facts
| Canonical name | Lakeover CCCT |
|---|---|
| Queue ID | E0047 |
| Status | active |
| Source status | active |
| Market | MISO |
| Technology | Gas |
| Capacity | 820.0 MW |
| State | Mississippi |
| County | Hinds |
| Point of interconnection | Green Acres 230kV (new) |
| Requested (queue) date | 2025-08-06 |
| Proposed in-service date | 2028-08-04 |
| Operational date | — |
| Withdrawn date | — |
| Developer | ENTERGY ARKANSAS |
| Utility / transmission owner | ENTERGY ARKANSAS |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata