Lansing 161 kV substation (R1018)

Lansing 161 kV substation is a 280.0 MW generation interconnection project with a current status of withdrawn. It is proposed to connect at Lansing 161 kV substation.

280.0 MWCapacity
WithdrawnStatus
Market
GenerationTechnology

Project facts

Canonical nameLansing 161 kV substation
Queue IDR1018
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGeneration
Capacity280.0 MW
State
CountyAllamakee
Point of interconnectionLansing 161 kV substation
Requested (queue) date2022-02-23
Proposed in-service date
Operational date
Withdrawn date2024-03-11
Developer
Utility / transmission ownerAlliant Energy West

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata