Laurel Mountain Hybrid (57447_1)

Laurel Mountain Hybrid is a 97.6 MW wind interconnection project in Barbour, West Virginia with a current status of operational.

97.6 MWCapacity
OperationalStatus
PJMMarket
WindTechnology

Project facts

Canonical nameLaurel Mountain Hybrid
Queue ID57447_1
Statusoperational
Source status(OP) Operating
MarketPJM
TechnologyWind
Capacity97.6 MW
StateWest Virginia
CountyBarbour
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2011-08-01
Withdrawn date—
Developer—
Utility / transmission ownerAES Distributed Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata