Lawton to Sunnyside 345 kV Substation (GEN-2020-074)

Lawton to Sunnyside 345 kV Substation is a 200.0 MW battery interconnection project in Carter, Oklahoma with a current status of withdrawn. It is proposed to connect at Lawton to Sunnyside 345 kV Substation.

200.0 MWCapacity
WithdrawnStatus
OKMarket
BatteryTechnology

Project facts

Canonical nameLawton to Sunnyside 345 kV Substation
Queue IDGEN-2020-074
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyBattery
Capacity200.0 MW
StateOklahoma
CountyCarter
Point of interconnectionLawton to Sunnyside 345 kV Substation
Requested (queue) date2020-04-28
Proposed in-service date2026-10-01
Operational date
Withdrawn date2025-10-02
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata