LE 69 kV Lewis Switch (GEN-2021-082)

LE 69 kV Lewis Switch is a 80.0 MW solar interconnection project in Lea, New Mexico with a current status of withdrawn. It is proposed to connect at LE 69 kV Lewis Switch.

80.0 MWCapacity
WithdrawnStatus
NMMarket
SolarTechnology

Project facts

Canonical nameLE 69 kV Lewis Switch
Queue IDGEN-2021-082
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologySolar
Capacity80.0 MW
StateNew Mexico
CountyLea
Point of interconnectionLE 69 kV Lewis Switch
Requested (queue) date2021-04-23
Proposed in-service date2024-09-01
Operational date
Withdrawn date2023-07-11
Developer
Utility / transmission ownerLEA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.