Lee - Menlo 120kV Line (J865)

Lee - Menlo 120kV Line is a 80.0 MW solar interconnection project in St. Clair County, Michigan with a current status of withdrawn. It is proposed to connect at Lee - Menlo 120kV Line.

80.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameLee - Menlo 120kV Line
Queue IDJ865
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity80.0 MW
StateMichigan
CountySt. Clair County
Point of interconnectionLee - Menlo 120kV Line
Requested (queue) date2017-06-16
Proposed in-service date2020-09-01
Operational date2020-09-01
Withdrawn date2019-01-09
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata