Leeville 115kV (J1833)

Leeville 115kV is a 115.1 MW gas interconnection project in Lafourche, Louisiana with a current status of operational. It is proposed to connect at Leeville 115kV.

115.1 MWCapacity
OperationalStatus
Market
GasTechnology

Project facts

Canonical nameLeeville 115kV
Queue IDJ1833
Statusoperational
Source statusDone
Market
TechnologyGas
Capacity115.1 MW
StateLouisiana
CountyLafourche
Point of interconnectionLeeville 115kV
Requested (queue) date2021-10-19
Proposed in-service date2026-05-01
Operational date2026-05-01
Withdrawn date
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata