Leland Olds 345 kV (GEN-2016-130)

Leland Olds 345 kV is a 202.0 MW wind interconnection project in Mercer, North Dakota with a current status of operational. It is proposed to connect at Leland Olds 345 kV.

202.0 MWCapacity
OperationalStatus
NDMarket
WindTechnology

Project facts

Canonical nameLeland Olds 345 kV
Queue IDGEN-2016-130
Statusoperational
Source statusIA FULLY EXECUTED/COMMERCIAL OPERATION
MarketND
TechnologyWind
Capacity202.0 MW
StateNorth Dakota
CountyMercer
Point of interconnectionLeland Olds 345 kV
Requested (queue) date2016-11-30
Proposed in-service date
Operational date2019-09-15
Withdrawn date
Developer
Utility / transmission ownerBEPC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata