Leland Olds 345kV substation is a 150.0 MW solar interconnection project in Mercer, North Dakota with a current status of active. It is proposed to connect at Leland Olds 345kV substation.

150.0 MWCapacity
ActiveStatus
NDMarket
SolarTechnology

Project facts

Canonical nameLeland Olds 345kV substation
Queue IDGEN-2019-037
Statusactive
Source statusIA FULLY EXECUTED/ON SUSPENSION
MarketND
TechnologySolar
Capacity150.0 MW
StateNorth Dakota
CountyMercer
Point of interconnectionLeland Olds 345kV substation
Requested (queue) date2019-05-17
Proposed in-service date2030-11-19
Operational date
Withdrawn date
Developer
Utility / transmission ownerBEPC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata