Leland Olds 345kV substation (GEN-2021-100)

Leland Olds 345kV substation is a 50.0 MW battery interconnection project in Mercer, North Dakota with a current status of withdrawn. It is proposed to connect at Leland Olds 345kV substation.

50.0 MWCapacity
WithdrawnStatus
NDMarket
BatteryTechnology

Project facts

Canonical nameLeland Olds 345kV substation
Queue IDGEN-2021-100
Statuswithdrawn
Source statusWITHDRAWN
MarketND
TechnologyBattery
Capacity50.0 MW
StateNorth Dakota
CountyMercer
Point of interconnectionLeland Olds 345kV substation
Requested (queue) date2021-05-24
Proposed in-service date2027-10-19
Operational date—
Withdrawn date2023-07-14
Developer—
Utility / transmission ownerBEPC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata