LeLand Olds-Chapelle Creek 345kV line (GEN-2020-021)

LeLand Olds-Chapelle Creek 345kV line is a 235.0 MW wind interconnection project in Sioux County, North Dakota with a current status of withdrawn. It is proposed to connect at LeLand Olds-Chapelle Creek 345kV line.

235.0 MWCapacity
WithdrawnStatus
NDMarket
WindTechnology

Project facts

Canonical nameLeLand Olds-Chapelle Creek 345kV line
Queue IDGEN-2020-021
Statuswithdrawn
Source statusWITHDRAWN
MarketND
TechnologyWind
Capacity235.0 MW
StateNorth Dakota
CountySioux County
Point of interconnectionLeLand Olds-Chapelle Creek 345kV line
Requested (queue) date2020-04-24
Proposed in-service date2026-12-31
Operational date
Withdrawn date2025-11-26
Developer
Utility / transmission ownerBEPC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata