Lemars Tap-Little Sioux 161kV (J1978)

Lemars Tap-Little Sioux 161kV is a 175.0 MW wind interconnection project in Pocahontas, Iowa with a current status of withdrawn. It is proposed to connect at Lemars Tap-Little Sioux 161kV.

175.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameLemars Tap-Little Sioux 161kV
Queue IDJ1978
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity175.0 MW
StateIowa
CountyPocahontas
Point of interconnectionLemars Tap-Little Sioux 161kV
Requested (queue) date2021-08-23
Proposed in-service date2025-10-01
Operational date2025-10-01
Withdrawn date2025-10-27
Developer
Utility / transmission ownerMIDAMERICAN ENERGY CO.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata