Lemoyne-Majestic 345kV (J1951)

Lemoyne-Majestic 345kV is a 50.0 MW battery interconnection project in Monroe, Michigan with a current status of withdrawn. It is proposed to connect at Lemoyne-Majestic 345kV.

50.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameLemoyne-Majestic 345kV
Queue IDJ1951
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity50.0 MW
StateMichigan
CountyMonroe
Point of interconnectionLemoyne-Majestic 345kV
Requested (queue) date2021-08-24
Proposed in-service date2024-10-01
Operational date2024-10-01
Withdrawn date2023-09-06
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.