Lenox 120kV Substation (Bus #264749) (J3832)

Lenox 120kV Substation (Bus #264749) is a 200.0 MW battery interconnection project in Macomb, Michigan with a current status of withdrawn. It is proposed to connect at Lenox 120kV Substation (Bus #264749).

200.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameLenox 120kV Substation (Bus #264749)
Queue IDJ3832
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity200.0 MW
StateMichigan
CountyMacomb
Point of interconnectionLenox 120kV Substation (Bus #264749)
Requested (queue) date2024-07-30
Proposed in-service date2028-04-05
Operational date2028-04-05
Withdrawn date2025-12-22
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata