Leonardtowne (X1-025)

Leonardtowne is a 10.0 MW solar interconnection project in St. Mary's, Maryland with a current status of withdrawn.

10.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameLeonardtowne
Queue IDX1-025
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity10.0 MW
StateMaryland
CountySt. Mary's
Point of interconnection—
Requested (queue) date2011-02-28
Proposed in-service date2012-04-30
Operational date—
Withdrawn date2011-04-08
Developer—
Utility / transmission ownerPEPCO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.