LEPA Unit No. 1 (58478_LEPA2)

LEPA Unit No. 1 is a 17.1 MW gas interconnection project in St Mary, Louisiana with a current status of operational.

17.1 MWCapacity
OperationalStatus
MISOMarket
GasTechnology

Project facts

Canonical nameLEPA Unit No. 1
Queue ID58478_LEPA2
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyGas
Capacity17.1 MW
StateLouisiana
CountySt Mary
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2016-06-01
Withdrawn date—
Developer—
Utility / transmission ownerLouisiana Energy & Power Authority

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata