Lewiston CMP Cluster 5 (1242)

Lewiston CMP Cluster 5 is a 52.5 MW solar+battery interconnection project in Oxford/Androscoggin, Maine with a current status of withdrawn. It is proposed to connect at CMP Lewiston.

52.5 MWCapacity
WithdrawnStatus
MEMarket
Solar+BatteryTechnology

Project facts

Canonical nameLewiston CMP Cluster 5
Queue ID1242
Statuswithdrawn
Source statusW
MarketME
TechnologySolar+Battery
Capacity52.5 MW
StateMaine
CountyOxford/Androscoggin
Point of interconnectionCMP Lewiston
Requested (queue) date2022-03-28
Proposed in-service date2028-06-30
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata