LH252W (LG-23-3-1)
LH252W is a 252.0 MW wind interconnection project in Grant County, New Mexico with a current status of active. It is proposed to connect at Hidalgo-Luna 345 kV line.
252.0 MWCapacity
ActiveStatus
NMMarket
WindTechnology
Project facts
| Canonical name | LH252W |
|---|---|
| Queue ID | LG-23-3-1 |
| Status | active |
| Source status | LGIA in effect |
| Market | NM |
| Technology | Wind |
| Capacity | 252.0 MW |
| State | New Mexico |
| County | Grant County |
| Point of interconnection | Hidalgo-Luna 345 kV line |
| Requested (queue) date | 2023-03-14 |
| Proposed in-service date | 2028-05-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | El Paso Electric Company |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: epe-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata