Lighthouse Energy Storage (1589)

Lighthouse Energy Storage is a 250.0 MW battery interconnection project in Monroe, New York with a current status of withdrawn. It is proposed to connect at Dunkirk to Gardenville 230 kV line #74.

250.0 MWCapacity
WithdrawnStatus
AMarket
BatteryTechnology

Project facts

Canonical nameLighthouse Energy Storage
Queue ID1589
Statuswithdrawn
Source status0
MarketA
TechnologyBattery
Capacity250.0 MW
StateNew York
CountyMonroe
Point of interconnectionDunkirk to Gardenville 230 kV line #74
Requested (queue) date2023-08-07
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperGrid Connected Infrastructure, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata