Lilliwaup Falls Hydro Project (G0498)

Lilliwaup Falls Hydro Project is a 2.0 MW other interconnection project in Mason, Washington with a current status of operational. It is proposed to connect at BPA Potlatch Substation.

2.0 MWCapacity
OperationalStatus
WAMarket
OtherTechnology

Project facts

Canonical nameLilliwaup Falls Hydro Project
Queue IDG0498
Statusoperational
Source statusENERGIZED
MarketWA
TechnologyOther
Capacity2.0 MW
StateWashington
CountyMason
Point of interconnectionBPA Potlatch Substation
Requested (queue) date2014-08-12
Proposed in-service date
Operational date2014-10-20
Withdrawn date
DeveloperLilliwaup Falls Generating Company
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata