Linden Plant Improvement (0014)

Linden Plant Improvement is a 20.0 MW gas interconnection project in Richmond-NJ, New York with a current status of withdrawn. It is proposed to connect at Goethals 345kV.

20.0 MWCapacity
WithdrawnStatus
JMarket
GasTechnology

Project facts

Canonical nameLinden Plant Improvement
Queue ID0014
Statuswithdrawn
Source status0
MarketJ
TechnologyGas
Capacity20.0 MW
StateNew York
CountyRichmond-NJ
Point of interconnectionGoethals 345kV
Requested (queue) date1999-03-25
Proposed in-service date2008-07-10
Operational date
Withdrawn date
DeveloperEast Coast Power LLC
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.