Linton NW 115 kV (radial to Wishek 115 kV) (J2085)

Linton NW 115 kV (radial to Wishek 115 kV) is a 40.0 MW solar interconnection project in Emmons, North Dakota with a current status of withdrawn. It is proposed to connect at Linton NW 115 kV (radial to Wishek 115 kV).

40.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameLinton NW 115 kV (radial to Wishek 115 kV)
Queue IDJ2085
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity40.0 MW
StateNorth Dakota
CountyEmmons
Point of interconnectionLinton NW 115 kV (radial to Wishek 115 kV)
Requested (queue) date2021-11-01
Proposed in-service date2024-11-01
Operational date2024-11-01
Withdrawn date2025-10-27
Developer
Utility / transmission ownerMONTANA-DAKOTA UTILITIES CO.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata