Logan 230kV Substation (GEN-2017-216)

Logan 230kV Substation is a 100.0 MW wind interconnection project in Ward, North Dakota with a current status of withdrawn. It is proposed to connect at Logan 230kV Substation.

100.0 MWCapacity
WithdrawnStatus
NDMarket
WindTechnology

Project facts

Canonical nameLogan 230kV Substation
Queue IDGEN-2017-216
Statuswithdrawn
Source statusWITHDRAWN
MarketND
TechnologyWind
Capacity100.0 MW
StateNorth Dakota
CountyWard
Point of interconnectionLogan 230kV Substation
Requested (queue) date2017-11-30
Proposed in-service date2026-12-30
Operational date
Withdrawn date2023-10-12
Developer
Utility / transmission ownerBEPC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata