Longhorn-McNary 230 kV Loop (L0653)

Longhorn-McNary 230 kV Loop is a 2,225.0 MW other interconnection project with a current status of active. It is proposed to connect at Longhorn Substation, McNary Substation.

2,225.0 MWCapacity
ActiveStatus
—Market
OtherTechnology

Project facts

Canonical nameLonghorn-McNary 230 kV Loop
Queue IDL0653
Statusactive
Source statusSTUDY
Market—
TechnologyOther
Capacity2,225.0 MW
State—
CountyUmatilla And Morrow
Point of interconnectionLonghorn Substation, McNary Substation
Requested (queue) date2025-06-02
Proposed in-service date2028-06-03
Operational date—
Withdrawn date—
DeveloperUmatilla Electric Cooperative
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—activehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-11-26

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata