Lovett #3 Repowering (0058)

Lovett #3 Repowering is a 180.0 MW generation interconnection project with a current status of withdrawn. It is proposed to connect at Lovett.

180.0 MWCapacity
WithdrawnStatus
—Market
GenerationTechnology

Project facts

Canonical nameLovett #3 Repowering
Queue ID0058
Statuswithdrawn
Source status0
Market—
TechnologyGeneration
Capacity180.0 MW
StateNew York
County—
Point of interconnectionLovett
Requested (queue) date2000-03-23
Proposed in-service date—
Operational date—
Withdrawn date—
DeveloperMirant
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata