Lowman Energy Center (56_LEC2)

Lowman Energy Center is a 273.7 MW gas interconnection project in Washington, Alabama with a current status of operational.

273.7 MWCapacity
OperationalStatus
SOCOMarket
GasTechnology

Project facts

Canonical nameLowman Energy Center
Queue ID56_LEC2
Statusoperational
Source status(OP) Operating
MarketSOCO
TechnologyGas
Capacity273.7 MW
StateAlabama
CountyWashington
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2023-09-01
Withdrawn date
Developer
Utility / transmission ownerPowerSouth Energy Cooperative

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata