LRS-Wayne Child 345 Line (GI-TC-2024-06)
LRS-Wayne Child 345 Line is a 150.0 MW wind interconnection project in Platte County, Wyoming with a current status of active. It is proposed to connect at LRS-Wayne Child 345 Line.
150.0 MWCapacity
ActiveStatus
WYMarket
WindTechnology
Project facts
| Canonical name | LRS-Wayne Child 345 Line |
|---|---|
| Queue ID | GI-TC-2024-06 |
| Status | active |
| Source status | FACILITY STUDY STAGE |
| Market | WY |
| Technology | Wind |
| Capacity | 150.0 MW |
| State | Wyoming |
| County | Platte County |
| Point of interconnection | LRS-Wayne Child 345 Line |
| Requested (queue) date | 2023-05-22 |
| Proposed in-service date | 2026-10-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | TSGT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; tristate-oasis. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | active | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata