Lyons Ferry Substation (L0370)

Lyons Ferry Substation is a 18.4 MW other interconnection project in Garfield, Washington with a current status of withdrawn. It is proposed to connect at BPA's Central Ferry Substation.

18.4 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology

Project facts

Canonical nameLyons Ferry Substation
Queue IDL0370
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyOther
Capacity18.4 MW
StateWashington
CountyGarfield
Point of interconnectionBPA's Central Ferry Substation
Requested (queue) date2014-05-23
Proposed in-service date2015-12-31
Operational date
Withdrawn date
DeveloperColumbia Rural Electric Association
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata