Madrid - Blackfoot 345kV (J1911)

Madrid - Blackfoot 345kV is a 200.0 MW solar interconnection project in Livingston, Michigan with a current status of withdrawn. It is proposed to connect at Madrid - Blackfoot 345kV.

200.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameMadrid - Blackfoot 345kV
Queue IDJ1911
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity200.0 MW
StateMichigan
CountyLivingston
Point of interconnectionMadrid - Blackfoot 345kV
Requested (queue) date2021-08-22
Proposed in-service date2023-11-01
Operational date2023-11-01
Withdrawn date2023-09-06
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata