Madrid Substation 120 kV - Bus number 265650 (J3858)

Madrid Substation 120 kV - Bus number 265650 is a 110.0 MW solar interconnection project in Livingston, Michigan with a current status of withdrawn. It is proposed to connect at Madrid Substation 120 kV - Bus number 265650.

110.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameMadrid Substation 120 kV - Bus number 265650
Queue IDJ3858
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity110.0 MW
StateMichigan
CountyLivingston
Point of interconnectionMadrid Substation 120 kV - Bus number 265650
Requested (queue) date2024-12-18
Proposed in-service date2029-06-01
Operational date2029-06-01
Withdrawn date2026-07-22
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata